Re-planning support system for make-to-order production with reserved resources

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-site production planning in hybrid make-to-stock/make-to-order production environment

Today competitive environment has enforced practitioners and researchers to pay great attention to issues enhancing both production and marketing competitiveness. To do so, it has been obligatory for the firms to consider production side activities while customer requirements are on the other side of competition. In this regard, hybrid make-to-stock (MTS)/make-to-order (MTO) production systems ...

متن کامل

A Simulation-Optimization Model For Capacity Coordination In Make To Stock/Make To Order Production Environments

Capacity coordination, as the tactical level of hierarchical production planning in hybrid MTS/MTO systems, includes numerous important decisions. In this paper, two of these decisions i.e. finding the best strategy for the acceptance/rejection of incoming orders and determining orders’ due dates – are investigated. Also a simulation model is proposed to evaluate the efficiency of the presented...

متن کامل

Collaborative production planning with production time windows and order splitting in make-to-order manufacturing

In this paper, we study a generalized production planning problem, that simultaneously investigates the two decisions that play critical roles in most firms, namely, production planning and order splitting and assignment. The problem takes into consideration the production time windows and capacities. We formulate the integrated problem as a linear mixed-integer program with a minimized total c...

متن کامل

Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system

Nowadays, manufacturing organisations face increasing pressures from the frequent change in product type, continuous demand fluctuation and unexpected change in customer requirements. In order to survive in the turbulent environment, manufacturing organisations must become flexible and responsive to these dynamic changes in the business environment. This paper presents a hierarchical agent bidd...

متن کامل

Re-planning in the Multi-agent System for Production Planning

Automation of the re-planning process is an activity of immense importance in production planning systems. We introduce a novel perspective on production planning through substituting classical scheduling and planning mechanism with the process of job delegation and responsibility negotiation among information units – agents of a multi-agent systems. The article comments on various causes and m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2004

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207540412331282042