منابع مشابه
Delay performance in random-access grid networks
We examine the impact of torpid mixing and meta-stability issues on the delay performance in wireless random-access networks. Focusing on regular meshes as prototypical scenarios, we show that the mean delays in an L×L toric grid with normalized load ρ are of the order ( 1 1−ρ ). This superlinear delay scaling is to be contrasted with the usual linear growth of the order 1 1−ρ in conventional q...
متن کاملAccessibility and Delay in Random Temporal Networks
In a wide range of complex networks, the links between the nodes are temporal and may sporadically appear and disappear. This temporality is fundamental to analyzing the formation of paths within such networks. Moreover, the presence of the links between the nodes is a random process induced by nature in many real-world networks. In this paper, we study random temporal networks at a microscopic...
متن کاملrodbar dam slope stability analysis using neural networks
در این تحقیق شبکه عصبی مصنوعی برای پیش بینی مقادیر ضریب اطمینان و فاکتور ایمنی بحرانی سدهای خاکی ناهمگن ضمن در نظر گرفتن تاثیر نیروی اینرسی زلزله ارائه شده است. ورودی های مدل شامل ارتفاع سد و زاویه شیب بالا دست، ضریب زلزله، ارتفاع آب، پارامترهای مقاومتی هسته و پوسته و خروجی های آن شامل ضریب اطمینان می شود. مهمترین پارامتر مورد نظر در تحلیل پایداری شیب، بدست آوردن فاکتور ایمنی است. در این تحقیق ...
Tcp in Networks with Abrupt Delay Variations and Random Loss
This paper provides a preliminary investigation of the effect of abrupt round-trip variations on the performance of different versions of TCP. It is shown that end-toend goodput of a bulk TCP transfer can be severely limited by variations in RTT primarily due to the non-adaptiveness of TCP’s timeout estimation and fast recovery thresholds. The paper proposes a model for evaluating the performan...
متن کاملDelay-constrained utility maximisation in multi-hop random access networks
Multi-hop random access networks have received much attention due to their distributed nature which facilitates deploying many new applications over the sensor and computer networks. Recently, utility maximization framework is applied in order to optimize performance of such networks, however proposed algorithms result in large transmission delays. In this paper, we will analyze delay in random...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Transactions on Information Theory
سال: 2009
ISSN: 0018-9448
DOI: 10.1109/tit.2009.2012999