Railway Track Crack Detection Technique

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Square Joints in Railway Track Waves

When rails are laid in a railway track, small gaps are left between the ends of adjoining rails to allow for the expansion of the rails when the temperature rises. Rail joints are provided to form a continuous rail path which are normally laid in standard lengths bolted together by fishplates. When two rail joints are exactly opposing each other, they are called square (side by side) joints...

متن کامل

Square Joints in Railway Track Waves

When rails are laid in a railway track, small gaps are left between the ends of adjoining rails to allow for the expansion of the rails when the temperature rises. Rail joints are provided to form a continuous rail path which are normally laid in standard lengths bolted together by fishplates. When two rail joints are exactly opposing each other, they are called square &#10&#10(side by side) jo...

متن کامل

Railway Track Allocation

This article gives an overview of the results of the author’s PhD thesis Schlechte [2012]. The thesis deals with the mathematical optimization for the efficient use of railway infrastructure. We address the optimal allocation of the available railway track capacity the track allocation problem. This track allocation problem is a major challenge for a railway company, independent of whether a fr...

متن کامل

Track Detection in Railway Sidings Based on MEMS Gyroscope Sensors

The paper presents a two-step technique for real-time track detection in single-track railway sidings using low-cost MEMS gyroscopes. The objective is to reliably know the path the train has taken in a switch, diverted or main road, immediately after the train head leaves the switch. The signal delivered by the gyroscope is first processed by an adaptive low-pass filter that rejects noise and c...

متن کامل

Railway track inspection using GPR

Ž . Swiss Federal Railways SBB inspect their railway tracks at regular intervals. The first step of track renewal planning is a geotechnical study. Inspection is focused on the thickness of the ballast, on subsoil material penetrating upwards into the ballast and on geotechnical properties of subgrade and subsoil materials. Up to now, the inspection has been done mainly by digging trenches at e...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IJIREEICE

سال: 2018

ISSN: 2321-5526,2321-2004

DOI: 10.17148/ijireeice.2018.6106