Quasicomplete factorization and the two machine flow shop problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Inverse scheduling: two-machine flow-shop problem

We study an inverse counterpart of the two machine flow-shop scheduling problem that arises in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find job sequence(s) for which the value of the makespan is minimum, in the inverse scheduling the exact values of processing times are unknown and they should be selected with...

متن کامل

The two - machine flow shop problem with delays and the one - machine total tardiness problem

A partial order on a job set is called consistent, if it has a linear extension which is an optimal solution to the total tardiness problem of the job set. The concept of proper augmentations of consistent partial orders is based on Emmons' well-known dominance theorem. In this paper, we address the question whether the proper augmentation of a consistent partial order always results in a parti...

متن کامل

Approximations for the Two-Machine Cross-Docking Flow Shop Problem

We consider in this article the Two-Machine Cross-Docking Flow Shop problem, which is a special case of scheduling with typed tasks, where we have two types of tasks and one machine per type. Precedence constraints exist between tasks, but only from a task of the first type to a task of the second type. The precedence relation is thus a directed bipartite graph. Minimizing the makespan is stron...

متن کامل

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

Two machine Flow shop with transportation time

We present a scheduling problem of the flow-shop type. We introduce a transportation system: robot or conveyor. This transportation system is also involved in machine loading and unloading. The studied workshop consists of two machines and a conveyor that must process a set of tasks. Tasks having just been executed wait for the conveyor to be transported. The objective is to determine a feasibl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Linear Algebra and its Applications

سال: 1998

ISSN: 0024-3795

DOI: 10.1016/s0024-3795(97)10082-9