Quantitative Risk Assessment Model and Optimization in Infrastructure Fast-Track Construction Projects

نویسندگان

چکیده

The construction industry has extensively applied the fast-tracking approach to demanding need for fast delivery of infrastructure projects. However, fast-track strategy might be threatened by distinctive risks or changes in risk characteristics that emerge when activities are overlapped (overlapping risks). This article proposes a assessment simulation model quantify economic impact overlapping on uses Monte Carlo and proprietary engine solution optimization procedure. It quantifies impacts project duration cost could originate three different degrees evaluates optimal degree reduce risks. demonstration used commercial renovation project. results suggest have high potential total cost, although with probability attaining target duration. Eight top affected duration, both. optimum achieve combines degrees. study contribution is projects considering risks, their characteristic as distribution, relationship between these

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

A MATHEMATICAL MODEL FOR SELECTING THE PROJECT RISK RESPONSES IN CONSTRUCTION PROJECTS

Risks are natural and inherent characteristics of major projects. Risks are usually considered independently in analysis of risk responses. However, most risks are dependent on each other and independent risks are rare in the real world. This paper proposes a model for proper risk response selection from the responses portfolio with the purpose of optimization of defined criteria for projects. ...

متن کامل

Equitable Risk Allocation in Construction Projects: Fuzzy Bargaining Game Approach

An equitable risk allocation between contracting parties plays a vital role in enhancing the performance of the project. This research presents a new quantitative risk allocation approach by integrating fuzzy logic and bargaining game theory. Owing to the imprecise and uncertain nature of players’ payoffs at different risk allocation strategies, fuzzy logic is implemented to determine the value...

متن کامل

Dynamic Risk Assessment in Construction Projects Using Bayesian Networks

This paper presents a systemic Bayesian network (BN) based approach for dynamic risk assessment for adjacent buildings in tunnel construction. This approach consists of four steps in detail, namely, hazard analysis, BN learning and BN-based risk analysis. In the dynamic risk analysis framework, the predictive, sensitivity and diagnostic analysis techniques in the Bayesian inference are used to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Infrastructures

سال: 2023

ISSN: ['2412-3811']

DOI: https://doi.org/10.3390/infrastructures8040078