Quantitative risk analysis procedure for economic project sustainability.

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ICT4D Project Sustainability: An ANT-based Analysis

The difficulty of sustaining ICT4D projects in developing nations is a formidable issue encountered by project managers. Addressing this issue is vital given reasons such as the opportunity cost of IT investment failure in developing-world contexts. This paper presents a study which explores the sustainability of ICT4D projects via a case study of a large-scale, nation-wide, government sector I...

متن کامل

System Dynamics Aproach For Quantitative Risk Allocaion

Allocation of construction risks between clients and their contractors has a significant impact on the total construction costs. This paper presents a system dynamics (SD)-based approach for quantitative risk allocation. Using the proposed SD based approach, all the factors affecting the risk allocation process are modeled. The contractor’s defensive strategies against the one-sided risk alloca...

متن کامل

Analysis of interactions among barriers in project risk management

In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...

متن کامل

Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interv...

متن کامل

A Statistical-Probabilistic Pattern for Determination of Tunnel Advance Step by Quantitative Risk Analysis

One of the main challenges faced in design and construction phases of tunneling projects is the determination of maximum allowable advance step to maximize excavation rate and reduce project delivery time. Considering the complexity of determining this factor and unexpected risks associated with inappropriate determination of that, it is necessary to employ a method which is capable of accounti...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability, Agri, Food and Environmental Research

سال: 2021

ISSN: 0719-3726

DOI: 10.7770/safer-v10n1-art2501