Quality in civil construction in Brazil

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Including the people with disabilities at work: a case study of the job of bricklayer in civil construction in Brazil.

The aim of this paper is to present the results of the evaluation of the job of bricklayer in the construction industry to determine the profile of workers with disabilities who could perform this function and what adjustments are needed. The methods and techniques used in the field study were: direct observation of the activities and the environment, interviews with bricklayers on building sit...

متن کامل

strategies applied in translation of culture-specific items in translation of the i. r. i. constitution &the civil code (from persian into english(

این تحقیق به بررسی استراتژیهای بکاررفته توسط مترجمین مختلف در ترجمه واژه های فرهنگی خاص در ترجمه فارسی به انگلیسی قانون مدنی و قانون اساسی جمهوری اسلامی ایران میپردازد.این تحقیق بر اساس نظریه پیتر نیومارک صرت گرفته است. در این تحفیق واژه های فرهنگی خاص اقتباس شده و پس از مقایسه با متن مبدا به بررسی انها پرداخته می شود.در قسمت ضمائم تحقیق واژه نامه ای برای اشنایی خوانندگان با لغات و اصطلاحات حقو...

Sensing methods in civil engineering for an efficient construction management

Sensing methods including Non-destructive testing and monitoring techniques are fundamental tools for performing an efficient condition management system for structures in service. They can on one hand support regular visual inspections and help on the other side to assess the actual condition and performance of a building. These methods provide reliable data for the stakeholders to estimate th...

متن کامل

BIM functions for optimized construction management in civil engineering

Purpose The aim of this study is to suggest configuration methodologies of active building information model (BIM) functions that enable to practically control limitations by optimizing schedule overlapping linked to its space models after analyzing workspace conflict analysis for a bridge model. This study also suggests development methodologies of active BIM-functions, linking an optimized me...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MOJ Civil Engineering

سال: 2018

ISSN: 2572-8520

DOI: 10.15406/mojce.2018.04.00107