Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions
نویسندگان
چکیده
منابع مشابه
Qualitative and quantitative risk assessment
Risk assessment and HACCP are related, but fundamentally dierent processes. Four major elements of risk assessment are commonly described (hazard identi®cation; exposure assessment; dose-response assessment or hazard characterization; and risk characterization). Some similarities exist between the inputs for the ®rst elements of risk assessment (hazard identi®cation) and HACCP (hazard analysis...
متن کاملAn Introduction to Hybrid Model Inventory Control with a Green Supplier Selection Model under Uncertainty
In the current decade, determining the most appropriate supplier as a strategic factor in the supply chain has attracted lots of consideration. On the other hand, organizations do necessary measures to implement green supply chain management in order to improve environmental and economic performance. An important way to implement green supply chain management, could be revising the method of pu...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملa model for relief logistic under uncertainty conditions
for effective crisis management, appropriate telecommunications, which are required to fast response, are crucial. therefore, lack of existing proper telecommunications detract senior managers’ awareness about crisis conditions and also disturb rescuers in relief, causing increasing attendance time to the injured and fatalities. transfer point location problem is one of the new issues in the li...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Heliyon
سال: 2020
ISSN: 2405-8440
DOI: 10.1016/j.heliyon.2019.e03097