Putting context to numbers: a geotechnical risk trajectory to cost overrun extremism

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The cost of dental caries in Saudi Arabia. Putting numbers into context.

A wellness is not easy to define, the World Health Organization (WHO) in 19481 defined health as “a complete state of physical, social, and mental well-being and not merely absence of disease”. This bio-psycho-social model changed the previous concept of health oriented merely by disease. Therefore, promoting oral health, and preventing dental caries is a dimension of being healthy. Tremendous ...

متن کامل

Managing Cost Overrun Risk in Project Funding Allocation

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...

متن کامل

: examining l2 teachers’ corrective feedback types in relation to learners’ uptake, proficiency levels, and context types

abstract this study investigates the teachers’ correction of students’ spoken errors of linguistic forms in efl classes, aiming at (a) examining the relationship between the learners’ proficiency level and the provision of corrective feedback types, (b) exploring the extent to which teachers’ use of different corrective feedback types is related to the immediate types of context in which err...

Extend a ranking method of trapezoidal fuzzy numbers to all fuzzy numbers by a weighting functions

Recently Abbasbandy and Hajjari (Computers and Mathematics with Applications57 (2009) 413-419) have introduced a ranking method for the trapezoidalfuzzy numbers. This paper extends theirs method to all fuzzy numbers,which uses from a defuzzication of fuzzy numbers and a general weightingfunction. Extended method is interesting for ranking all fuzzy numbers, and itcan be applied for solving and ...

متن کامل

Putting it Simply: a Context-Aware Approach to Lexical Simplification

We present a method for lexical simplification. Simplification rules are learned from a comparable corpus, and the rules are applied in a context-aware fashion to input sentences. Our method is unsupervised. Furthermore, it does not require any alignment or correspondence among the complex and simple corpora. We evaluate the simplification according to three criteria: preservation of grammatica...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Construction Management and Economics

سال: 2018

ISSN: 0144-6193,1466-433X

DOI: 10.1080/01446193.2018.1513656