Public Infrastructure Asset Assessment with Limited Data
نویسندگان
چکیده
منابع مشابه
Project selection with limited resources in data envelopment analysis
In this paper allocating a fixed resource for producing finite projects in order to obtaining a desired level of efficiency will be discussed. Note that it is assumed that a vector of limited sources is at hand. This vector of resources can be contained human resource, budget, equipment, and facilities. In any firm there exist different suggestions from subunits for running...
متن کاملUsing Neural Networks with Limited Data to Estimate Manufacturing Cost
Neural networks were used to estimate the cost of jet engine components, specifically shafts and cases. The neural network process was compared with results produced by the current conventional cost estimation software and linear regression methods. Due to the complex nature of the parts and the limited amount of information available, data expansion techniques such as doubling-data and data-cr...
متن کاملIntermediate outcomes of a tribal community public health infrastructure assessment.
The purpose of this collaborative participatory project was to assess the strengths and needs of a tribal community as part of a larger public health capacity building program. Key project partners included: the Ramah Band of Navajo Indians, the Albuquerque Area Indian Health Board, the University of New Mexico Masters in Public Health Program, and the University of Nevada, Las Vegas, American ...
متن کاملEvaluating Asset Pricing Models with Limited Commitment using Household Consumption Data
We evaluate the asset pricing implications of a class of models in which risk sharing is imperfect because of the limited enforcement of intertemporal contracts. Lustig (2004) has shown that in such a model the asset pricing kernel can be written as a simple function of the aggregate consumption growth rate and the growth rate of consumption of the set of households that do not face binding enf...
متن کاملInfrastructure Asset Management of Urban Water Systems
IAM methods partially differ from those applicable to managing other types of assets. One of the reasons is the fact that such infrastructures have indefinite lives, in order to satisfy the permanent needs of a specific public service. Infrastructures are not replaceable as a whole, only piecemeal. Consequently, in a mature infrastructure, all phases of assets lifetime coex‐ ist. Additionally, ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Open Journal of Civil Engineering
سال: 2017
ISSN: 2164-3164,2164-3172
DOI: 10.4236/ojce.2017.73032