Providing a Suitable Model for Solving Resource Leveling in Project Management

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-objective Scheduling Model for Solving the Resource-constrained Project Scheduling and Resource Leveling Problems

The project resource leveling problem was proposed to smooth resource usage and reduce resource fluctuation, while the resource-constrained project scheduling problem focuses on minimizing the project duration with limited resources. Solving the two interrelated problems separately is unlikely to result in a globally optimum schedule. The few integrated optimization methods that have been devel...

متن کامل

Providing a model for the possibility of establishing a standard 34,000 human resource management system in Ansar Bank

The present study seeks to provide a model for the possibility of establishing a standard system of 34,000 human resource management and provide a favorable model in Ansar Bank. Managers and experts of Ansar Bank are considered as a statistical population of a small section, which was about 1500 people, is a cluster sampling method. In this study, to estimate the sample size according to the nu...

متن کامل

Resource Leveling in Fuzzy Project Scheduling

In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...

متن کامل

A fuzzy multi-objective model for a project management problem

In this research, the multi-objective project management decision problem with fuzzy goals and fuzzy constraints are considered. We constitute α-cut approach and two various fuzzy goal programming solution methods for solving the Multi-Objective Project Management (MOPM) decision problem under fuzzy environments. The Interactive fuzzy multi-objective linear programming (i-FMOLP) and Weighted Ad...

متن کامل

Providing A Model for Management Earnings Forecast Bias

Despite The Important Role That Management Profit Forecasting Plays In The Decision Making Of Capital Market Actors, These Predictions Appear To Be Biased. In The Attempt To Measure The Bias Of Predicting Profit Management, Numerous One- Dimensional Measurement Tools Have Been Proposed In The Accounting And Finance Literature. Despite These Efforts, No Comprehensive Composite Index Has Been Dev...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mediterranean Journal of Social Sciences

سال: 2016

ISSN: 2039-9340,2039-2117

DOI: 10.5901/mjss.2016.v7n2s2p116