Project Time-Cost Tradeoff Problem with Milestones under an Uncertain Processing Time
نویسندگان
چکیده
منابع مشابه
Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملeffects of project uncertainties on nonlinear time-cost tradeoff profile
this study presents the effects of project uncertainties on nonlinear time-cost tradeoff (tct) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ann) models with hybrid meta-heuristic (hmh) technique, abridged as fuzzy-ann-hmh. nonlinear time-cost relationship of project activities is dealt with ann models. ann models are then integrated with ...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملA New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management
In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملA New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets
Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Korean Operations Research and Management Science Society
سال: 2013
ISSN: 1225-1119
DOI: 10.7737/jkorms.2013.38.2.025