Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks
نویسندگان
چکیده
منابع مشابه
Project Portfolio Risk Response Selection Using Bayesian Belief Networks
Risk identification, impact assessment, and response planning constitute three building blocks of project risk management. Correspondingly, three types of interactions could be envisioned between risks, between impacts of several risks on a portfolio component, and between several responses. While the interdependency of risks is a well-recognized issue, the other two types of interactions remai...
متن کاملAnalysis of interactions among barriers in project risk management
In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success...
متن کاملSoftware project risk analysis using Bayesian networks with causality constraints
Available online 8 November 2012
متن کاملproject portfolio optimization considering project interactions using teaching-learning optimization alghorithm
: nowadays, organizations are faced with a multitude of project and investment opportunities. despite the importance of various criteria, complexity of multi-objective models and weakness of optimization algorithms often compelled manager to limit the selection criteria or only suffice to financial objects. in this paper, it is endeavored to extend selection criteria by using an efficient optim...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2018
ISSN: 2071-1050
DOI: 10.3390/su10051609