Project Planning Application to Juice Production Using PERT/CPM Technique: A Case Study

نویسندگان

چکیده

Timely delivery of natural and fresh juice to its’ growing customers is the focus SCUBED 100%. The CPM (Critical Path Method) PERT (Program Evaluation Review Technique) techniques were applied in minimizing expected time duration for production at current a batch stood 656.66 minutes. Modifications made on initial model minimize after two modification processes, an estimated 458.33 minutes was realized, saving 198.33 (about 3.3 hours) time. This study encapsulates interplay theoretical insights practical implementation, confirming potential operational research management designing real-world outcomes. 100%'s journey towards excellence demonstrates transformative optimization.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of TDA technique to estimate the hydrocarbon saturation using MRIL Data: A Case study for a Southern Iranian Oilfield

Petrophysical evaluation of petroleum reservoirs is one of the most challenging tasks for hydrocarbon reserve determination. One critical petrophysical parameter is the water saturation which is normally calculated from Archie’s equation. Carbonate reservoirs, however, due to their complex mineralogy are not good candidates for Archie’s equation because Archie’s parameters are strongly dependen...

متن کامل

planning and scheduling barley production mechanization project using the pert network: case study alborz province

agricultural mechanization project must be identified in a short time frame to do a certain way; otherwise, cost is not the time to come and will also result in reduced yield. to avoid these costs in farming systems is necessary in any region that agricultural mechanization projects are and scheduling and planning as well as scientific until activities included in the project to fruition are do...

متن کامل

Determining production level under uncertainty using fuzzy simulation and bootstrap technique, a case study

In every production plant, it is necessary to have an estimation of production level. Sometimes there are many parameters affective in this estimation. In this paper, it tried to find an appropriate estimation of production level for an industrial factory called Barez in an uncertain environment. We have considered a part of production line, which has different production time for different kin...

متن کامل

Application of Multi Objective land Allocation technique for land use Planning Approach Case study: Hamadan County

From the late  twentieth century, human kind has found out that if he wants to obtain cost efficiently and continuous utilization of lands, it is better to execute this in a planned framework named management plan. Such idea is became  as an introduction to monitor the land or utilization of lands. Monitoring lands means contribution of an optimized space for land utilization with realization o...

متن کامل

Case Mix Planning using The Technique for Order of Preference by Similarity to Ideal Solution and Robust Estimation: a Case Study

Management of surgery units and operating room (OR) play key roles in optimizing the utilization of hospitals. On this line Case Mix Planning (CMP) is normally applied to long term planning of OR. This refers to allocating OR time to each patient’s group. In this paper a mathematical model is applied to optimize the allocation of OR time among surgical groups. In addition, another technique is ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Asian Journal of Probability and Statistics

سال: 2023

ISSN: ['2582-0230']

DOI: https://doi.org/10.9734/ajpas/2023/v24i2522