Project Performance Analysis Using the Earned Value Management (EVM) Method (Case Study: PT XYZ)

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Using Earned Value Management (EVM) in Spiral Development

Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder. Internal use. Permission to reproduce this document and to prepare derivative works from this document for internal use is granted, provided the copyright and " No Warranty " statements are included with all reproductions and derivative works. External use. Requests for permission ...

متن کامل

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

Important Factors for Organizational Performance Evaluation through Implementation of Earned Value Management (EVM) in North Taiwan

In order to cope with the rapid changes in the world, enterprises utilize project management methodology to globally outsource their works and to evaluate their internal and external work performance. Of all the project management techniques, Earned Value Management (EVM) is the major one that provides a method to evaluate project performance by integrating schedule and cost of work packages. E...

متن کامل

A comparison of the performance of various project control methods using earned value management systems

Recent literature on project management has emphasised the effort which is spent by the management team during the project control process. Based on this effort, a functional distinction can be made between a top down and a bottom up project control approach. A top down control approach refers to the use of a project control system that generates project based performance metrics to give a gene...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IPTEK Journal of Proceedings Series

سال: 2019

ISSN: 2354-6026

DOI: 10.12962/j23546026.y2019i5.6280