Project network analysis with fuzzy activity times
نویسندگان
چکیده
منابع مشابه
Analysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملanalysis of critical paths in a project network with random fuzzy activity times
project planning is part of project management, which is relates to the use of schedules such as gantt charts to plan and subsequently report progress within the project environment. initially, the project scope is defined and the appropriate methods for completing the project are determined. in this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملAnalysis of Critical Paths in a Project Network with Random Fuzzy Activity Times
93 AIJ Modeling, Identification, Simulation and Control, Vol 48, No. 2, Fall 2016 Please cite this article using: Kazemi, A., Talebi, A., and Oroojeni Mohammad-Javad, M., 2016. “Analysis of Critical Paths in a Project Network with Random Fuzzy Activity Times”. Amirkabir International Journal of Modeling, Identification, Simulation and Control, 48(2), pp. 93–101. DOI: 10.22060/miscj.2016.831 URL...
متن کاملCritical path analysis in the network with fuzzy activity times
A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the pap...
متن کاملOn the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers
In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Computers & Mathematics with Applications
سال: 1988
ISSN: 0898-1221
DOI: 10.1016/0898-1221(88)90120-4