Project Management Patterns to Prevent Schedule Delay Caused by Requirement Elicitation

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Management Patterns to Prevent Schedule Delay Caused by Requirements Changes - Empirical Study on a Successful Project

We propose PM (Project Management) patterns in order to prevent schedule delays caused by requirements changes on empirical studies. Changes or late elicitation of requirements during the design, coding and test processes are one of the most serious risks, which may delay the project schedules. However, changes and late elicitation of requirements are sometimes inevitably accepted during the de...

متن کامل

Managing Complexity in Requirement Elicitation

Abstract : an approach for managing complexity through requirements elicitation and traceability model. The approach makes use of two approaches development. The first on a traceability model that have been developed and applied to a complex industrial system and a requirement elicitation approach and tool. The paper makes use of these approaches and show how a traceability even at requirement ...

متن کامل

Regular Sleep Schedule: A Way to Prevent Emotional/Behavioral Problems in Children

Abstract Background: Prevention of children's behavioral problems is more important and necessary for parents, teachers, educators, and psychologists. In this article, behavioral-emotional disorders have been defined. Then, to prevent behavioral problems in children, Regular sleep planning is suggested, Finally, the conclusion was made. Method: Data analysis in the present study was done i...

متن کامل

Assessment of Requirement Elicitation Tools and Techniques by Various Parameters

Software development cycle is based on the software requirements. Requirement elicitation is first and most important activity in the requirement engineering. If the requirements are efficiently elicited and managed then the stakeholders application can be accomplished within time and budget. If the requirements are not complete, consistent and correct then projects fail because they not meet t...

متن کامل

Resilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)

Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEICE Transactions on Information and Systems

سال: 2010

ISSN: 0916-8532,1745-1361

DOI: 10.1587/transinf.e93.d.745