Project management in a competitive environment: interdicting a CPM based project and its implications
نویسندگان
چکیده
There are two opponents in a classic network interdiction problem, owner/defender and interdictor/attacker. Each side has enough information about the other’s possible courses of action. While user wishes to run an optimal way, attacker with limited resources tries prevent operation by interdicting arcs/nodes network. In this study, we investigate project management competitive environment using approach. We assume that owner/manager strives minimize completion time Critical Path Method (CPM) based while opponent attempts maximize minimum inflicting some delays on activities available resources. Considering both discrete continuous delay times, develop bi-level mixed-integer programming models for interdictor. Using duality, then convert standard single-level models, which solvable through optimization packages. extend these find efficient solutions terms from interdictor’s perspective. respect, algorithm solution set Next, manager’s standpoint, discuss earliest latest scheduling times case interdiction. Finally, apply developed techniques marketing aiming at introducing new product. The findings may enhance better where can adversely affect process delaying activities.
منابع مشابه
learner autonomy in a computer-assisted project-based efl reading classroom
آموزش برمبنای ذخیره اطلاعات ، دانشجویان را به عنوان افرادی غیر متفکر وغیرقابل کنترل می پندارد . در همین راستا ، خواندن در سیستم آموزشی برمبنای ذخیره اطلاعات ، مهارتی پنداشته می شود که می توان آن را با یاد گرفتن انفعالی وجداگانه تعدادی از مهارتهای جزیی فراگرفت . درآن سو خواندن در سیستم آموزشی برمبنای طرح مسآله ،به عنوان رفتاری نقادانه تلقی می شود که از طریق آن می توان دنیای فرای کلمات را کشف کرد...
Collaborative Project Management (CPM)
Zulieferer übernehmen inzwischen immer umfangreichere Aufgaben in der Entwicklung und Produktion, was zu neuen Herausforderungen im Projektmanagement führt. Nach VDA (2003) sind deshalb neue Formen der Zusammenarbeit zwischen Projektpartnern notwendig. Aus diesem Grund initiierten BMW und Daimler gemeinsam mit großen Zulieferern wie ZF Friedrichshafen, Karmann und Keiper beim ProSTEP iViP Verei...
متن کاملInterdicting a Nuclear-Weapons Project
A “proliferator” seeks to complete a first small batch of fission weapons as quickly as possible, whereas an “interdictor” wishes to delay that completion for as long as possible. We develop and solve a max-min model that identifies resourcelimited interdiction actions that maximally delay completion time of the proliferator’s weapons project, given that the proliferator will observe any such a...
متن کاملA Systems Dynamics Model for Project Management systems of Project-Based Organization
It is obvious that the success of a project-based organization is dependent on its projects. A variety of tools such as the project excellence model, project management maturity models, the earned value method, have been developed in this regard, but there are still delays in projects because the projects have dynamic nature with non-linear relationships and feedback processes during the projec...
متن کاملProject Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)
Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Rairo-operations Research
سال: 2021
ISSN: ['1290-3868', '0399-0559']
DOI: https://doi.org/10.1051/ro/2019089