Project development of a “smart” premise system for pig keeping

نویسندگان

چکیده

The economic efficiency of intensive animal husbandry on an industrial basis depends the rational keeping, which is largely determined by availability optimal microclimate in premises. Whatever breed and pedigree qualities animals possess, they are unable to maintain health display their potential hereditary productive abilities without creating necessary conditions. In period 2018-2020, a survey 11 farms Perm Krai was carried out, where respiratory, digestive, skin diseases were found, some cases stress observed animals. cost heating livestock premises generally much lower than losses from murrain, reduced productivity, feed overruns. Physical properties air environment unstable factors subject large fluctuations. To optimize premises, algorithm program for computers developed, will allow create system that provides conditions keeping maintenance improve life safety farms. this regard, calves cows’ project managing parameters has been developed. Microclimate management developed of: Order Ministry Agriculture Russian Federation dated October 21, 2000 No. 621 “On approval Veterinary rules pigs purpose reproduction, cultivation sales.” Monitoring based automated analysis regulation parameters' indicators. software hardware implementation done Omron PLC.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Smart Hybrid System for Parking Space Reservation in VANET

Nowadays, developed and developing countries using smart systems to solve their transportation problems. Parking guidance intelligent systems for finding an available parking space, are considered one of the architectural requirements in transportation. In this paper, we present a parking space reservation method based on adaptive neuro-fuzzy system(ANFIS) and multi-objective genetic algorithm....

متن کامل

Development of a forward chain approach for calculating self-delay of project activities

In the field of management, the delay within projects is a prominent and contentious issue. Due to the fact that delay leads to cost and time over-runs, it is often the subject of litigation claims and creation of managerial tensions. In a bid to bring such delays under control and also to diminish managerial tensions, it is necessary to recognize and understand the following four concepts:"typ...

متن کامل

Development of a Set of Algorithms for the Multi-Project Scheduling Problems

In this paper, the problem of determining the best schedule for a set of projects has been modeled in the form of a generalized tardiness flowshop (GTF) problem. We develop a set of heuristic algorithms for minimizing the total tardiness of jobs in a GTF problem. In the generalized version of tardiness flowshop problems, a job is considered to be a collection of operations and there is a due da...

متن کامل

Title: Development of a Smart Pumping System

In today’s global economy, process plants are under constant pressure to reduce costs. Users can no longer afford their attempts to make pumps bulletproof by upgrading component specifications. The development of a smart pumping system was fostered by a challenge from a major chemical user to reduce the total cost of pump ownership. A smart pumping system was successfully developed that can rea...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: E3S web of conferences

سال: 2021

ISSN: ['2555-0403', '2267-1242']

DOI: https://doi.org/10.1051/e3sconf/202125408029