Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
نویسندگان
چکیده
منابع مشابه
Quality- and profit-oriented scheduling of flexible resource-constrained projects
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with respect to the implementation of the optional activities. Such decisions affect the duration, cost, qual...
متن کاملScheduling resource-constrained projects with a flexible project structure
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally implemented activities. However, established model formulations and solution approaches for the resourc...
متن کاملCyclic Scheduling of Flexible Job-shop with Time Window Constraints and Resource Capacity Constraints
This paper deals with the cyclic scheduling of flexible job-shop with time window constraints and resource capacity constraints. For time window constraints, the duration for processing products on machines and the duration for translating products from one machine to another by transfers are taken into account; for the resource capacity constraints, the confined operation space of machines and...
متن کاملProfit-oriented resource allocation using online scheduling in flexible heterogeneous networks
In this paper, we discuss a generalized measurement-based adaptive scheduling framework for dynamic resource allocation in flexible heterogeneous networks, in order to ensure efficient service level performance under inherently variable traffic conditions. We formulate our generalized optimization model based on the notion of a “profit center” with an arbitrary number of service classes, nonlin...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Business Research
سال: 2018
ISSN: 2198-3402,2198-2627
DOI: 10.1007/s40685-018-0063-5