Profit-driven stochastic scheduling considering discounted cash flows under Industry 4.0
نویسندگان
چکیده
منابع مشابه
Resource Investment Problem with Discounted Cash Flows
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered as decision variables and the goal is to find a schedule, and resource requirement levels, such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash fl...
متن کاملResource Investment Problem With Discounted Cash Flows
A resource investment problem is a project-scheduling problem in which the availability levels of the resources are considered decision variables and the goal is to find a schedule and resource requirement levels such that some objective function optimizes. In this paper, we consider a resource investment problem in which the goal is to maximize the net present value of the project cash flows. ...
متن کاملProj ect Scheduling with Discounted Cash Flows and Progress Payments
In all large scale projects, there correspond cash flows that incur throughout the life of the project. The scheduling of these projects to maximize the present value of the cash flows has been a topic of recent research. The basic assumption of earlier research is that the cash flows are mainly associated with some events of the project and they occur at the event realization times. However, i...
متن کاملOptimizing Discounted Cash Flows in Project Scheduling - An Ant Colony Optimization Approach
The multimode resource-constrained projectscheduling problem with discounted cash flows (MRCPSPDCF) is important and challenging for project management. As the problem is strongly nondeterministic polynomial-time hard, only a few algorithms exist and the performance is still not satisfying. To design an effective algorithm for the MRCPSPDCF, this paper proposes an ant colony optimization (ACO) ...
متن کاملSolving a multi-objective multi-mode resource-constrained project scheduling problem with discounted cash flows
This paper presents a multi-objective multi-mode resource-constrained project scheduling problem (MRCPSP) with positive and negative cash flows. We consider the objectives of the net present value (NPV) maximization and robustness maximization along by makespan minimization. Furthermore, to make a model close to the real world situations, two types of commonly used payment models are considered...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2019
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2019.11.519