Production rescheduling through product quality prediction

نویسندگان

چکیده

In production management, efficient scheduling is key towards smooth and balanced production. Scheduling can be well-supported by real-time data acquisition systems, resulting in decisions that rely on actual or predicted status of environment jobs progress. Utilizing advanced monitoring prediction-based rescheduling method proposed react in-process scrap predictions, performed machine learning algorithms. Based overall rescheduled with higher efficiency, compared to after completion the whole machining process realization scrap. Series numerical experiments are presented demonstrate potentials rescheduling, early-stage detection.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Defect Prediction Leads to High Quality Product

Defect prediction is relatively a new research area of software quality assurance. A project team always aims to produce a quality product with zero or few defects. Quality of a product is correlated with the number of defects as well as it is limited by time and by money. So, defect prediction is very important in the field of software quality and software reliability. This paper gives you a v...

متن کامل

An Integrated Model of Product, Production Process and Quality Information for Failure Prediction

This study proposes a methodology for predicting product failures occurring due to known failures and causalities. The prediction is based on failure propagation in an integrated model of a product, production process, and quality information (PPQ). This methodology enables a designer to predict new failures. One of the concepts for failure prediction is the PPQ for compiling referring to quali...

متن کامل

Production Scheduling and Rescheduling with Genetic Algorithms

A general model for job shop scheduling is described which applies to static, dynamic and non-deterministic production environments. Next, a Genetic Algorithm is presented which solves the job shop scheduling problem. This algorithm is tested in a dynamic environment under different workload situations. Thereby, a highly efficient decoding procedure is proposed which strongly improves the quali...

متن کامل

Improving Manufacturing System Performance through Rescheduling

Many production facilities generate and update production schedules. Rescheduling is necessary because the manufacturing system is dynamic and unexpected events occur. This paper discusses rescheduling policies and how they affect the performance of manufacturing systems. The benefits of proper rescheduling include improved manufacturing system performance with reduced cost due to computational...

متن کامل

Multi-objective Rescheduling Model for Product Collaborative Design Considering Disturbance

Disturbance is inevitable in product collaborative design (PCDSP), which has always posed a great challenge for enterprises making quick response. Thus, in the paper, a multi-objective rescheduling model and its solution algorithm are presented. Disturbance cases are analysed and dynamic scheduling procedure based on event-driven and lifecycle-driven is developed firstly. Then a multiobjective ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Manufacturing

سال: 2021

ISSN: ['2351-9789']

DOI: https://doi.org/10.1016/j.promfg.2021.07.022