Production Rate Estimated with Flow-Shop Reversibility

نویسندگان
چکیده

منابع مشابه

A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times

Many authors have examined lot sizing, scheduling and sequence of multi-product flow shops, but most of them have assumed that set up times are independent of sequence. Whereas dependence of set up times to sequence is more common in practice. Hence, in this paper, we examine the discussed problem with hypothesis of dependence of set up times to sequence and cyclic schedule policy in basic peri...

متن کامل

Simultaneous production planning and scheduling in a hybrid flow shop with time periods and work shifts

Simultaneous production planning and scheduling has been identified as one of the most important factors that affect the efficient implementation of planning and scheduling operations for the production systems. In this paper, simultaneous production planning and scheduling is applied in a hybrid flow shop environment, which has numerous applications in real industrial settings. In this problem...

متن کامل

Hybrid flow-shop with adjustment

The subject of this paper is a flow-shop based on a case study aimed at the optimisation of ordering production jobs in mechanical engineering, in order to minimize the overall processing time, the makespan. The production jobs are processed by machines, and each job is assigned to a certain machine for technological reasons. Before processing a job, the machine has to be adjusted; there is onl...

متن کامل

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

Incomplete Reversibility of Estimated Glomerular Filtration Rate Decline Following Tenofovir Disoproxil Fumarate Exposure

BACKGROUND Tenofovir disoproxil fumarate (TDF) has been linked to renal impairment, but the extent to which this impairment is reversible is unclear. We aimed to investigate the reversibility of renal decline during TDF therapy. METHODS Cox proportional hazards models assessed factors associated with discontinuing TDF in those with an exposure duration of >6 months. In those who discontinued ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Bulletin of JSME

سال: 1978

ISSN: 0021-3764,1881-1426

DOI: 10.1299/jsme1958.21.167