Production planning and control systems – a new software architecture Connectivity in target

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Design of a New Mathematical Model for Integrated Dynamic Cellular Manufacturing Systems and Production Planning

This paper presents a new mathematical model for integrated dynamic cellular manufacturing systems and production planning that minimizes machine purchasing, intra-cell material handling, cell reconfiguration and setup costs. The presented model forms the manufacturing cells and determines the quantity of machine and movements  during each period of time. This problem is NP-hard, so a meta-heur...

متن کامل

Intelligent Production Planning and Control in the Cloud – Towards a Scalable Software Architecture

Today’s manufacturing companies are undergoing a transformation towards increased digitalization, automation of manufacturing processes and as well new forms of manufacturing organization and business models. While large-size manufacturing companies are able to follow the pace of such technological developments, smallto mid-size manufacturing companies (SME) often experience substantial problem...

متن کامل

A new Approach Versus Benders Decomposition in Aggregate Production Planning

This paper proposes a simplified solution procedure to the model presented by Akinc and Roodman. The Benders’ decomposition procedure for analyzing this model has been developed, and its shortcomings have been highlighted. Here, the special nature of the problem is exploited which allowed us to develop a new algorithm through surrogating method. The two methods are compared by several numerical...

متن کامل

A Multivariate Quality Control Procedure in Multistage Production Systems

In this paper a multivariate quality control procedure is offered in which several correlated stages are present in production systems and in each stage there are several correlated control variable. Using Hotelling's T2 statistic, first, each stage is tested for being out of control. Then out of control variables are selected using Murphy's method. The remainder of the research involves evalua...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia CIRP

سال: 2019

ISSN: 2212-8271

DOI: 10.1016/j.procir.2019.02.089