Production lot-sizing decision making considering bottle-neck drift in multi-stage manufacturing system

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ergo-Lot-Sizing: Considering Ergonomics in Lot-Sizing Decisions

One aspect that has mostly been overlooked in traditional economic lot-sizing is the implication of decisions on manual tasks and workload. Although lot-sizing decisions can have a significant impact on required manual material handling and on human performance, works that consider ergonomic aspects in lot-sizing are rare. This paper presents a model that integrates ergonomic aspect in terms of...

متن کامل

A Polynomial Algorithm for the Multi-Stage Production-Capacitated Lot-Sizing Problem

The multi-stage lot-sizing problem with production capacities (MLSP-PC) deals with a supply chain that consists of a manufacturer with stationary production capacity and intermediaries (distribution centers or wholesalers) and a retailer to face deterministic demand. An optimal supply chain plan for the MLSP-PC specifies when and how many units each organization of the supply chain has to produ...

متن کامل

Stochastic Decision Making in Manufacturing Environments

Decision making plays an important role in economics, psychology, philosophy, mathematics, statistics and many other fields. In each field, decision making consists of identifying the values, uncertainties and other issues that define the decision. In any field, the nature of the decisions is affected by environmental characteristics. In this paper, we are considered the production planning pro...

متن کامل

Robust Multi-Stage Decision Making

Testifying to more than ten years of academic and practical developments, this tutorial attempts to provide a succinct yet unified view of the robust multi-stage decision making framework. In particular, the reader should better understand: (1) the distinction between static versus fully or partially adjustable decisions; (2) the root of tractability issues; (3) the connection to robust dynamic...

متن کامل

Multi-Objective Scheduling Problem in a Three-Stage Production System

A three stage production system is considered in this paper. There are two stages to fabricate and ready the parts and an assembly stage to assembly the parts and complete the products in this system. Suppose that a number of products of different kinds are ordered. Each product is assembled with a set of several parts. At first the parts are produced in the first stage with parallel machines a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Advances in Production Engineering & Management

سال: 2017

ISSN: 1854-6250,1855-6531

DOI: 10.14743/apem2017.3.252