Process-oriented tolerancing for multi-station assembly systems
نویسندگان
چکیده
منابع مشابه
Process-oriented tolerancing for multi-station assembly systems
YU DING,1 JIONGHUA JIN,2 DARIUSZ CEGLAREK3 and JIANJUN SHI4 1Department of Industrial Engineering, Texas A&M University, College Station, TX 77843, USA E-mail: [email protected] 2Department of Systems and Industrial Engineering, The University of Arizona, Tucson, AZ 85721, USA E-mail: [email protected] 3Department of Industrial Engineering, University of Wisconsin—Madison, Madison, WI ...
متن کاملPrecisely positioning pallets in multi-station assembly systems
In multi-station assembly systems, common for mass-customization manufacturing strategies, the product being assembled is held in a fixture attached to a pallet, and the pallet is conveyed between workstations. In high-precision assembly systems, variation in the position of the pallet is one of the largest sources of variation within the error budget, reducing quality and yields. Conventional ...
متن کاملA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملProcess-oriented tolerancing using the extended stream of variation model
Current works on process-oriented tolerancing for multi-station manufacturing processes (MMPs) have been mainly focused on allocating fixture tolerances to ensure part quality specifications at a minimum manufacturing cost. Some works have also included fixture maintenance policies into the tolerance allocation problem since they are related to both manufacturing cost and final part quality. Ho...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IIE Transactions
سال: 2005
ISSN: 0740-817X,1545-8830
DOI: 10.1080/07408170490507774