Abstract While earthquakes can have a devastating impact on the economic growth and social welfare of earthquake prone regions, probabilistic seismic risk assessment be employed to assess mitigate such risks from future destructive events. In previous study (Sianko et al. in Bull Earthq Eng 18:2523–2555, 2020), hazard analysis (PSHA) tool based Monte-Carlo approach, was developed predict for high seismicity areas. this study, framework is incorporating previously PSHA tool, with vulnerability functions various damage criteria, exposures casualty models. Epistemic uncertainty addressed using logic trees distribution functions. The estimate human losses particular return periods an event-based stochastic procedure. applied case area, city Adapazari Turkey. Seismic carried out different identify most vulnerable areas city. verification performed by comparing predicted those observed during 1999 Kocaeli that severely affected Adapazari. results indicate while overall predictions extensive complete states demonstrate strong correlation data, accurate at district level are not achievable without microzonation studies.
منابع مشابه
Analytic Solution of Seismic Probabilistic Risk Assessment
Probabilistic seismic risk assessments (PSRA) are used to quantify the seismic damage probability of complex engineering structures due to seismic events. In such systems, the seismic capacities of individual relevant components are determined by structure mechanics. A significant digits computation method to quantify the mean seismic failure probability (fragility) for given component capacity...
متن کاملRisk Perception of a Probabilistic Risk Assessment: a Case Study
Deterministic risk assessment, where parameters and variables that sometimes have a very high uncertainty are assigned one fixed value, have not been received well by Nevada stakeholders. Probabilistic risk assessment, a more modern approach that deals with uncertainty, has gained acceptance in much of the technical community. This paper describes an effort by the authors to determine whether t...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملProbabilistic Seismic Hazard Assessment of Tehran Based on Arias Intensity
A probabilistic seismic hazard assessment in terms of Arias intensity is presented for the city of Tehran. Tehran is the capital and the most populated city of Iran. From economical, political and social points of view, Tehran is the most significant city of Iran. Many destructive earthquakes happened in Iran in the last centuries. Historical references indicate that the old city of Rey and the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Bulletin of Earthquake Engineering
سال: 2023
ISSN: ['1573-1456', '1570-761X']
DOI: https://doi.org/10.1007/s10518-023-01674-2