Priority rule-based reconstruction for total weighted tardiness minimization of job-shop scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimization of Total Weighted Tardiness and Makespan for SDST Flow Shop Scheduling using Genetic Algorithm

In the present work, SDST flow shop scheduling with minimizing the weighted sum of total weighted tardiness and makespan have been considered simultaneously. Four modified heuristic have been proposed for preliminary viable sequence. Sequence obtained from the modified heuristics is combined with the initial seed sequence of genetic algorithm and called as Genetic Algorithm (GA). Hence four dif...

متن کامل

Hybrid Job Shop and parallel machine scheduling problems: minimization of total tardiness criterion

Scheduling is a scientific domain concerning the allocation of limited tasks over time. The goal of scheduling is to maximize (or minimize) different criteria of a facility as makespan, occupation rate of a machine, total tardiness ... In this area, scientific community usually group the problem with, on one hand the system studied, defining the number of machines (one machine, parallel machine...

متن کامل

A hybrid shifting bottleneck-tabu search heuristic for the job shop total weighted tardiness problem

In this paper, we study the job shop scheduling problem with the objective of minimizing the total weighted tardiness. We propose a hybrid shifting bottleneck tabu search (SB-TS) algorithm by replacing the reoptimization step in the shifting bottleneck (SB) algorithm by a tabu search (TS). In terms of the shifting bottleneck heuristic, the proposed tabu search optimizes the total weighted tardi...

متن کامل

A study on local search neighborhoods for the job shop scheduling problem with total weighted tardiness objective

In this paper we consider the job shop scheduling problem with total weighted tardiness objective (JSPTWT). This objective reflects the goal to achieve a high service level which is of increasing importance in many branches of industry. The paper concentrates on a class of baseline heuristics for this problem, known as neighborhood search techniques. An approach based on disjunctive graphs is d...

متن کامل

A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling

Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objec...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Advanced Mechanical Design, Systems, and Manufacturing

سال: 2014

ISSN: 1881-3054

DOI: 10.1299/jamdsm.2014jamdsm0073