Price Setting Supergames with Capacity Constraints
نویسندگان
چکیده
منابع مشابه
Collusive price leadership with capacity constraints
In this paper, collusive price leadership in homogeneous good capacity-constrained repeated price competition is examined. In the stage game, firms choose their timing of price setting. Although setting a price early is disadvantageous per se, a large firm has an incentive to move early in order to demonstrate its commitment not to deviate. If the discount factor is not too large, this behavior...
متن کاملOligopoly with Capacity Constraints and Thresholds
Abstract Extended Oligopoly models will be introduced and examined in which the firms might face capacity limits, thresholds for minimal and maximal moves, and antitrust thresholds in the case of partial cooperation. Similar situation occurs when there is an additional cost of output adjustment, which is discontinuous at zero due to set-up costs. In these cases the payoff functions of the...
متن کاملDynamic price competition with capacity constraints and a strategic buyer
We analyze a simple dynamic durable good oligopoly model where sellers are capacity constrained. Two incumbent sellers and potential entrants choose their capacities at the start of the game. We solve for equilibrium capacity choices and the (necessarily mixed) pricing strategies. In equilibrium, the buyer splits the order with positive probability to preserve competition; thus it is possible t...
متن کاملDynamic price competition with capacity constraints and strategic buyers
We analyze a simple dynamic framework where sellers are capacity constrained over the length of the game. Buyers act strategically in the market, knowing that their purchases may affect future prices. The model is examined when there are single and multiple buyers, with both linear and non-linear pricing. We find that, in general, there are only mixed strategy equilibria and that sellers get a ...
متن کاملSimultaneous frequency and capacity setting for rapid transit systems with a competing mode and capacity constraints
The railway planning problem consists of several consecutive phases: network design, line planning, timetabling, personnel assignment and rolling stocks planning. In this paper we will focus on the line planning process. Traditionally, the line planning problem consists of determining a set of lines and their frequencies optimizing a certain objective. In this work we will focus on the line pla...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Review of Economic Studies
سال: 1985
ISSN: 0034-6527
DOI: 10.2307/2297659