منابع مشابه
Project Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملNet Present Value with Uncertainty
Projects may be evaluated and compared according to the Net Present Value (NPV) of their cash flow. The NPV is the discounted expected revenues minus the costs over the lifetime of the project. Traditional NPV calculations do not take into account the uncertainty in the variables that influence the revenues and costs. We present a simulation approach to incorporate uncertainty in the NPV calcul...
متن کاملFuzzy Interval Net Present Value
In this paper we conjugate the operative usability of the net present value with the capability of the fuzzy and the interval approaches to manage uncertainty. Our fuzzy interval net present value can be interpreted, besides the usual present value of an investment project, as the present value of a contract in which the buyer lets the counterpart the possibility to release goods/services for m...
متن کاملNet Shape Nanostructured Aluminum Oxide Structures Fabricated by Plasma Spray Forming
The plasma spray technique has been used by several researchers to deposit nanostructured ceramic coatings, but there is no available literature discussing how to fabricate a bulk, freestanding nanostructured component by such a technique. In the current study, net shape nanostructured Al2O3 structures have been fabricated using the plasma spray technique. A detailed characterization of the spr...
متن کاملNet Present Value of Cash Flows in Single Machine and Flow Shop Scheduling Problems
While a great portion of the scheduling literature focuses on time-based criteria, the most important goal of management is maximizing the profitability of the firm. In this paper, the net preset value criterion is studied taking account of linear time-dependent cash flows in single machine and flow shop scheduling problems. First, a heuristic method is presented for the single machine scheduli...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Japan Society for Precision Engineering
سال: 2014
ISSN: 0912-0289,1882-675X
DOI: 10.2493/jjspe.80.1045