Preprocessing the Discrete Time-Cost Tradeoff Problem with Generalized Precedence Relations
نویسندگان
چکیده
منابع مشابه
Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations
In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...
متن کاملMinimizing the Project Cost with Generalized Precedence Relations
Minimizing the project cost is a task of project scheduling, and usually is a starting point in the optimization about cost, for example the time-cost tradeoff is to compress the project duration from the one with minimum cost. Project cost can be minimized by letting all activities choose their minimum cost durations only when strict precedence relations exist between activities. But if genera...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملThe Discrete-Logarithm Problem with Preprocessing
This paper studies discrete-log algorithms that use preprocessing. In our model, an adversary may use a very large amount of precomputation to produce an “advice” string about a specific group (e.g., NIST P-256). In a subsequent online phase, the adversary’s task is to use the preprocessed advice to quickly compute discrete logarithms in the group. Motivated by surprising recent preprocessing a...
متن کاملMulti-armed bandit problem with precedence relations
Abstract: Consider a multi-phase project management problem where the decision maker needs to deal with two issues: (a) how to allocate resources to projects within each phase, and (b) when to enter the next phase, so that the total expected reward is as large as possible. We formulate the problem as a multi-armed bandit problem with precedence relations. In Chan, Fuh and Hu (2005), a class of ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2020
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2020/6312198