Predictive maintenance for the heated hold-up tank
نویسندگان
چکیده
منابع مشابه
Predictive maintenance for the heated hold-up tank
We present a numerical method to compute an optimal maintenance date for the test case of the heated hold-up tank. The system consists of a tank containing a fluid whose level is controlled by three components: two inlet pumps and one outlet valve. A thermal power source heats up the fluid. The failure rates of the components depends on the temperature, the position of the three components moni...
متن کاملMultivariable Predictive PID Control for Quadruple Tank
Strathprints is designed to allow users to access the research output of the University of Strathclyde. Unless otherwise explicitly stated on the manuscript, Copyright © and Moral Rights for the papers on this site are retained by the individual authors and/or other copyright owners. Please check the manuscript for details of any other licences that may have been applied. You may not engage in ...
متن کاملModel Predictive Control for the Modified Quadruple Tank System
In this paper, we present in a tutorial fashion the implementation of Model Predictive Control (MPC) on a virtual model of the modified quadruple tank system. The modified quadruple tank system is an example of a multi-input-multi-output (MIMO) system with known and unknown disturbances. Model Predictive Control is well known for its ability to deal with multivariable and complex control proble...
متن کاملLeaders hold an invitational Think Tank on undergraduate nursing education.
In response to the Canadian Nurses Association National Expert Commission’s Call to Action (NEC 2012), a focused meeting of nurse leaders was convened at (NEC) Dalhousie University in early November 2012. Hosted by the School of Nursing in collaboration with CNA, the purpose of the Think Tank was to initiate dialogue on how to respond to the report’s recommendation regarding reform of Canadian ...
متن کاملDoes Evolution Solve the Hold-Up Problem?
The paper examines the theoretical foundations of the hold–up problem. At a first stage, one agent decides on the level of a relationship– specific investment. There is no contract, so at a second stage the agent must bargain with a trading partner over the surplus that the investment has generated. We show that the conventional underinvestment result hinges crucially both on the assumed bargai...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Reliability Engineering & System Safety
سال: 2013
ISSN: 0951-8320
DOI: 10.1016/j.ress.2013.02.016