Prediction of Blasting Vibration Velocity of Layered Rock Mass under Multihole Cut Blasting

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An equivalent method for blasting vibration simulation

Article history: Received 8 December 2010 Received in revised form 18 May 2011 Accepted 19 May 2011 Available online 23 June 2011

متن کامل

Sensitivity Analysis of Stress and Cracking in Rock Mass Blasting using Numerical Modelling

Drilling and blasting have numerous applications in the civil and mining engineering. Due to the two major components of rock masses, namely the intact rock matrix and the discontinuities, their behavior is a complicated process to be analyzed. The purpose of this work is to investigate the effects of the geomechanical and geometrical parameters of rock and discontinuities on the rock mass blas...

متن کامل

Vibration Control of Underwater Blasting Works using Artificial Neural Networks

To allow the access of larger ships (Panamax class) to the interior docks of an important harbour in Portugal, a large volume of submerged rock had to be blasted. The harbour is surrounded by a densely populated urban area and the authors of this work were hired to monitor vibrations caused by the blasts. Macro-seismometers were installed in several locations inside the harbour perimeter and in...

متن کامل

Prediction of Rock Fragmentation Due to Blasting in Sarcheshmeh Copper Mine Using Artificial Neural Networks

The main objective in production blasting is to achieve a proper fragmentation. In this paper, rock fragmentation the Sarcheshmeh copper mine has been predicted by developing a model using artificial neural network. To construct the model, parameters such as burden to spacing ratio, holediameter, stemming, total charge-per-delay and point load index have been considered as input parameters. A m...

متن کامل

Synchronized Blasting Demolition of Workshop and Chimney Under Complicated Conditions

Received: March 17, 2017 Revised: July 25, 2017 Accepted: August 18, 2017 Abstract: Introduction: For technical renovation of the thermal plant, one frame structure workshop of 50,000 m construction area and one reinforcement concrete chimney of 150m height shall be demolished by blasting in the same time. The engineering environment is very complicated and the accommodation space for the struc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Shock and Vibration

سال: 2021

ISSN: 1875-9203,1070-9622

DOI: 10.1155/2021/5511190