TBM boreability and performance prediction has always been a hot research topic. In this paper, taking one large diameter long tunnel excavated by gripper hard rock in Northeastern China as background, based on number of boring data site mono-factorial regression analysis the correlations among Field Penetration Index (FPI) geological parameters, multi-factorial correlation formula FPI with uniaxial compressive strength (UCS) mass integrity coefficient (Kv) was established. Furthermore, penetration (P) thrust (F) were given. And classification method surrounding proposed. Therefore, according to above formulae, boreability, calculations penetration, advance rate required thrust, can be performed, which provide theoretical for estimation prediction, specifications design well project planning duration-cost analysis.
منابع مشابه
Engineering geological studies used for redesigning and employing a hard rock TBM in soft rock formations of Chamshir water conveyance tunnel
The Chamshir water conveyance tunnel (CWCT) with a length of 7.4 km and boring diameter of 5.3 m is excavated using a refurbished single shield TBM, initially designed to work in hard rock formations. This study focuses on engineering geological issues, which are important for checking the suitability of this machine and proposing required modifications for improving its performance in soft roc...
متن کاملFactors influencing performance of hard rock tunnel boring machines
Intact rock properties together with rock mass characteristics should be well investigated for selection of proper tunnel boring machine (TBM) for tunneling in various ground conditions. This is due to the significant impact of rock mass characteristics on machine performance. TBMs are site specific and designed for optimal performance in given ground conditions. When selected and put to work a...
متن کاملPrediction of hard rock TBM penetration rate based on Data Mining techniques
The aim of this work is to use Data Mining tools to develop models for the prediction of hard rock tunnel boring machine (TBM) penetration rate (ROP). A database published by Yagiz (2008) was used to develop these models. The parameters of the database were the uniaxial compressive strength (UCS), an index used to quantify the brittleness and toughness and denominated peak slope index (PSI), th...
متن کاملTBM Performance Prediction in Rock Tunneling Using Various Artificial Intelligence Algorithms
With widespread increasing applications of mechanized tunneling in almost all ground conditions, prediction of tunnel boring machine (TBM) performance is required for time planning, cost control and choice of excavation method in order to make tunneling economical. Penetration rate is a principal measure of full-face TBM performance and is used to evaluate the feasibility of the machine and pre...
متن کاملassessment of the park- ang damage index for performance levels of rc moment resisting frames
چکیده هدف اصلی از طراحی لرزه ای تامین ایمنی جانی در هنگام وقوع زلزله و تعمیر پذیر بودن سازه خسارت دیده، پس از وقوع زلزله است. تجربه زلزله های اخیر نشان داده است که ساختمان های طراحی شده با آیین نامه های مبتنی بر نیرو از نظر محدود نمودن خسارت وارده بر سازه دقت لازم را ندارند. این امر سبب پیدایش نسل جدید آیین نامه های مبتنی بر عملکرد شده است. در این آیین نامه ها بر اساس تغییرشکل های غیرارتجاعی ...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in transdisciplinary engineering
سال: 2022
ISSN: ['2352-751X', '2352-7528']
DOI: https://doi.org/10.3233/atde220922