Precedence theorems and dynamic programming for the single-machine weighted tardiness problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

New Instances for the Single Machine Total Weighted Tardiness Problem

Previous research in the single machine total weighted tardiness problem (SMTWTP) has led to the proposition of effective local search strategies. At least existing benchmark instances from the literature do not pose a challenge for state-of-the-art algorithms. This paper describes the proposition of two classes of novel instances for the single machine total weighted tardiness problem. In resp...

متن کامل

A problem space algorithm for single machine weighted tardiness problems

We propose a problem space genetic algorithm to solve single machine total weighted tardiness scheduling problems. The proposed algorithm utilizes global and time-dependent local dominance rules to improve the neighborhood structure of the search space. They are also a powerful exploitation (intensifying) tool since the global optimum is one of the local optimum solutions. Furthermore, the prob...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

Minimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem

  This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...

متن کامل

Single .machine Total Weighted Tardiness with Release Dates Single Machine Total Weighted Tardiness with Release Dates

The single machine total weighted tardiness with release dates problem is known to be strongly NP-hard. With a new lower bounding scheme and a new upper bounding scheme, we get an efficient branch and bound algorithm. In the paper, we first introduce the history of the problem and its computational complexity. Second, the lower bounding schemes and the upper bounding schemes are described in de...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2019

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2018.06.004