Possiblistic Programming for Various Decision Making : Part3:Stochastic and Possibilistic Programming
نویسندگان
چکیده
منابع مشابه
Fuzzy compromise programming for Group decision making
A multicriteria technique named fuzzy compromise programming is combined with a methodology known as group decision making under fuzziness to come up with a new technique that supports decision making with multiple criteria and multiple participants (or experts). All criteria (qualitative and quantitative) are modeled by way of fuzzy sets, utilizing the fact that criteria values in most water r...
متن کاملA goal programming procedure for ranking decision making units in DEA
This research proposes a methodology for ranking decision making units byusing a goal programming model.We suggest a two phases procedure. In phase1, by using some DEA problems for each pair of units, we construct a pairwisecomparison matrix. Then this matrix is utilized to rank the units via the goalprogramming model.
متن کاملPossibilistic sequential decision making
Article history: Received 21 March 2013 Received in revised form 14 November 2013 Accepted 15 November 2013 Available online 19 December 2013
متن کاملa method for solving possibilistic multi-objective linear programming problems with fuzzy decision variables
[naeini1] in this paper, a new method is proposed to find the fuzzy optimal solution of fuzzy multi-objective linear programming problems (fmolpp) with fuzzy right hand side and fuzzy decision variables. due to the imprecise nature of available resources, determination of a definitive solution to the model seems impossible. therefore, the proposed model is designed in order to make fuzzy decisi...
متن کاملModelling and Decision-making on Deteriorating Production Systems using Stochastic Dynamic Programming Approach
This study aimed at presenting a method for formulating optimal production, repair and replacement policies. The system was based on the production rate of defective parts and machine repairs and then was set up to optimize maintenance activities and related costs. The machine is either repaired or replaced. The machine is changed completely in the replacement process, but the productio...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Japan Society for Fuzzy Theory and Systems
سال: 2000
ISSN: 0915-647X,2432-9932
DOI: 10.3156/jfuzzy.12.3_21