Point-of-care coagulation testing for reducing in-hospital delay in thrombolysis

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

prediction of ignition delay period in d.i diesel engines

a semi-empirical mathematical model for predicting physical part of ignition delay period in the combustion of direct - injection diesel engines with swirl is developed . this model based on a single droplet evaporation model . the governing equations , namely , equations of droplet motion , heat and mass transfer were solved simultaneously using a rung-kutta step by step unmerical method . the...

Point-of-care coagulation testing: stepping gently forward.

As a specialist in diagnostic coagulation, I am frequently faced with a patient who does not want to drive into Boston to be monitored for warfarin (coumadin) therapy at our anticoagulation clinic. This fact has not been lost on instrument manufacturers, who have produced multiple point-of-care devices for home monitoring of the prothrombin time/international normalized ratio (PT/INR). The numb...

متن کامل

Point-of-care coagulation testing and transfusion algorithms.

Patients with cardiovascular disease have an array of haemostasis disorders that predispose to the development of thrombotic and embolic disease states. These patients are often maintained on anti-thrombotic medication to prevent adverse cardiovascular events. Patients undergoing cardiac surgery also have haemostatic disorders that include their intrinsic disease state, adjunctive medication, a...

متن کامل

Multidisciplinary Approach to Decrease In-Hospital Delay for Stroke Thrombolysis

BACKGROUND AND PURPOSE Decreasing the time delay for thrombolysis, including intravenous thrombolysis (IVT) with tissue plasminogen activator and intra-arterial thrombectomy (IAT), is critical for decreasing the morbidity and mortality of patients experiencing acute stroke. We aimed to decrease the in-hospital delay for both IVT and IAT through a multidisciplinary approach that is feasible 24 h...

متن کامل

Reducing delay in booking for antenatal care.

THE STUDY COMPARED TWO SCHEMES OF BOOKING FOR ANTENATAL CARE: booking at a health centre by general practitioners in conjunction with a hospital consultant or booking in a hospital clinic by hospital staff. the health centre scheme reduced the proportion of women booking late at 16 or more weeks gestation from 44% to 11% and at 20 weeks or more from 28% to 6%. There was no improvement in delay ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Hong Kong Journal of Emergency Medicine

سال: 2018

ISSN: 1024-9079,2309-5407

DOI: 10.1177/1024907918799938