Plant toxin β-ODAP activates integrin β1 and focal adhesion: A critical pathway to cause neurolathyrism

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Plant toxin β-ODAP activates integrin β1 and focal adhesion: A critical pathway to cause neurolathyrism

Neurolathyrism is a unique neurodegeneration disease caused by β-N-oxalyl-L-α, β- diaminopropionic (β-ODAP) present in grass pea seed (Lathyrus stativus L.) and its pathogenetic mechanism is unclear. This issue has become a critical restriction to take full advantage of drought-tolerant grass pea as an elite germplasm resource under climate change. We found that, in a human glioma cell line, β-...

متن کامل

Integrin and Focal Adhesion Kinase Signaling Pathway

Accumulating evidence reveals a significant correlation between angiopoietin 2 (Ang2) expression and tumor invasion and metastasis in various human cancers, but the major focus of recent studies has been on the angiogenic effects of Ang2. We recently reported that Ang2-stimulated glioma cell invasion results from the up-regulation and activation of matrix metalloprotease 2 (MMP-2) in tumor cell...

متن کامل

TLR4 Activates the β-catenin Pathway to Cause Intestinal Neoplasia

Colonic bacteria have been implicated in the development of colon cancer. We have previously demonstrated that toll-like receptor 4 (TLR4), the receptor for bacterial lipopolysaccharide (LPS), is over-expressed in humans with colitis-associated cancer. Genetic epidemiologic data support a role for TLR4 in sporadic colorectal cancer (CRC) as well, with over-expression favoring more aggressive di...

متن کامل

Wnt3a activates β1-integrin and regulates migration and adhesion of vascular smooth muscle cells.

Vascular smooth muscle cells (VSMCs) are known to undergo functional changes that contribute to the pathogenesis of atherosclerosis and restenosis. Wnts are a family of secreted glycoproteins that bind to transmembrane Frizzled receptors and initiate signaling cascades with indispensable roles during cell migration, adhesion, proliferation, and survival. The present study reports that wingless-...

متن کامل

Bacterial Genotoxins Promote Inside-Out Integrin β1 Activation, Formation of Focal Adhesion Complexes and Cell Spreading

Integrins are membrane bound receptors that regulate several cellular processes, such as cell adhesion, migration, survival and proliferation, and may contribute to tumor initiation/progression in cells exposed to genotoxic stress. The extent of integrin activation and its role in cell survival upon intoxication with bacterial genotoxins are still poorly characterized. These toxins induce DNA s...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Scientific Reports

سال: 2017

ISSN: 2045-2322

DOI: 10.1038/srep40677