Planning repetitive construction projects considering technological constraints
نویسندگان
چکیده
منابع مشابه
Fuzzy Scheduling of Repetitive Construction Projects
Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...
متن کاملScheduling Repetitive Construction Projects Using Fuzzy Linear Programming
Scheduling problem for repetitive construction projects involves three conflicting objectives. These objectives are project duration, project total cost, and project total interruption time. This paper presents a multi-objective fuzzy linear programming model (FLP) for resolving this problem. Literature concerned with scheduling problems for repetitive construction projects was reviewed. Multi-...
متن کاملTrajectory Planning on Grids: Considering Speed Limit Constraints
Trajectory (path) planning is a well known and thoroughly studied field of automated planning. It is usually used in computer games, robotics or autonomous agent simulations. Grids are often used for regular discretization of continuous space. Many methods exist for trajectory (path) planning on grids, we address the well known A* algorithm and the state-of-the-art Theta* algorithm. Theta* algo...
متن کاملA MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES
In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...
متن کاملOPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING
During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Open Engineering
سال: 2018
ISSN: 2391-5439
DOI: 10.1515/eng-2018-0058