Planning of railway engineering works including rail traffic disruptions
نویسندگان
چکیده
منابع مشابه
Railway Rolling Stock Planning: Robustness Against Large Disruptions
In this paper we describe a two-stage optimization model for determining robust rolling stock circulations for passenger trains. Here robustness means that the rolling stock circulations can better deal with large disruptions of the railway system. The two-stage optimization model is formulated as a large Mixed-Integer Linear Programming model. We first use Benders decomposition to determine op...
متن کاملImpacts of Wheel–rail at Railway Turnouts
Investigation of vertical vibrations of a railway turnout is important in designing track components under moving loads of trains. In this paper, the turnout is simulated by a linear finite element model with modal damping. A section of the turnout has a length of 36 sleeper spans surrounding the crossing. Rails and sleepers are modeled with uniform Rayleigh-
Timoshenko beam elements. The ra...
متن کاملImpacts of Wheel–rail at Railway Turnouts
Investigation of vertical vibrations of a railway turnout is important in designing track components under moving loads of trains. In this paper, the turnout is simulated by a linear finite element model with modal damping. A section of the turnout has a length of 36 sleeper spans surrounding the crossing. Rails and sleepers are modeled with uniform Rayleigh- Timoshenko beam elements. The rail...
متن کاملRailway Traffic Management
With the growing interest in the railway sector, mainly because of energetic reasons, there is also a need to increase the efficiency of the railway lines. One way to optimize this sector is to improve quality in the train control process itself. Nowadays, train dispatching is still mostly done by human operators that use elementary tools and thereby solving conflicts sub-optimally. Motivated b...
متن کاملPassenger-oriented railway disposition timetables in case of severe disruptions
Delays are one of the major reasons for passenger dissatisfaction in the railway industry. Depending on the gravity of the delay, timetables, crew schedules or rolling stock may be affected. In this research, we address the issue of timetable recovery in case of severe disruptions. Once an initial delay has occurred, the original timetable needs to be updated to a so-called disposition timetabl...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: MATEC Web of Conferences
سال: 2019
ISSN: 2261-236X
DOI: 10.1051/matecconf/201926207005