Planning and scheduling in the process industry
نویسندگان
چکیده
منابع مشابه
Planning and scheduling in the process industry
Since there has been tremendous progress in planning and scheduling in the process industry during the last 20 years, it might be worthwhile to give an overview of the current state-of-the-art of planning and scheduling problems in the chemical process industry. This is the purpose of the current review which has the following structure: we start with some conceptional thoughts and some comment...
متن کاملPlanning in the Process Industry
Since there has been tremendous progress in planning in the process industry during the last 25 years, it might be worthwhile to give an overview of the current state-of-the-art of planning problems in the process industry. This is the purpose of the current contribution which has the following structure: we start with some conceptional thoughts and some comments on special features of planning...
متن کاملMulti-scale Planning and Scheduling in The Pharmaceutical Industry
Most sophisticated planning and scheduling approaches for the process industry consider a fixed time horizon and assume that all data is given at the time of application. In this contribution we propose a planning and scheduling approach for a continuous and dynamic decision process where decisions have to be made before all data are available. As an inspiration we have a real world problem ori...
متن کاملHierarchical Scheduling and Utility Disturbance Management in the Process Industry
The integration of scheduling and control in the process industry is a topic that has been frequently discussed during the recent years, but many challenges remain in order to achieve integrated solutions that can be implemented for large-scale industrial sites. In this paper we consider production control under disturbances in the supply of utilities at integrated sites together with the integ...
متن کاملExact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: OR Spectrum
سال: 2002
ISSN: 0171-6468,1436-6304
DOI: 10.1007/s00291-002-0101-7