Pile defect quality control analysis on construction company in East Java

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simulation of Bored Pile Construction

The installation of pile foundations is complicated by an enormous number of problems. They include unseen subsurface obstacles, lack of contractor experience, and site planning. These major problems and other minor ones make it difficult for the estimator to evaluate the piling project productivity and cost. Therefore, this study is designed to assess these problems using simulation. Both pili...

متن کامل

An Analysis of the Local Resources Potential to Achieve Food Security in Jombang and Probolinggo Regencies East Java Indonesia

This study aims at analyzing the characteristics of the food need in the area of Jombang and Probolinggo regencies as well as developing a model of local superiority-based policy to achieve the food security. This study employs descriptive qualitative approach. This study is carried out in eight months in March to October 2015. The respondent of the study is the governmental staff of Jombang an...

متن کامل

Quality Control and Quality Assurance In Building Construction

The purpose of this thesis is to evaluate the use of Quality Function Deployment (QFD) as a management tool to benefit project managers. The United States building construction of Engineers is one of the largest construction management organizations in the world, annually performing over 3.5 billion dollars worth of work. The project manager has primary responsibility within the construction, t...

متن کامل

Lightweight Defect Localization for Java

A common method to localize defects is to compare the coverage of passing and failing program runs: A method executed only in failing runs, for instance, is likely to point to the defect. Some failures, though, come to be only through a specific sequence of method calls, such as multiple deallocation of the same resource. Such sequences can be collected from arbitrary Java programs at low cost;...

متن کامل

Cross- vs Within-Company Defect Prediction Studies

In a recent May 2007 IEEE TSE article, Kitchenham et.al. explored effort estimation and found contradictory evidence about the value of crossvs within-company data. Those contradictory results may have been the result of effort estimation features, some of which are subjective in nature. Static code features are different than effort estimation features. They can be generated in an automatic, r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IOP Conference Series: Materials Science and Engineering

سال: 2021

ISSN: 1757-8981,1757-899X

DOI: 10.1088/1757-899x/1034/1/012118