Permutation flowshop scheduling problem with Total Core Idle Time Minimization
نویسندگان
چکیده
In this paper, we present a deterministic permutation flowshop scheduling problem with new objective function, the total core idle time. The interest of is related to reduce energy consumption system, taking into account that needed during processing times constant, and machines are switched off front back times. Therefore, dependent on time where in stand-by mode, i.e between jobs, named as Constructive heuristics metaheuristics adapted from literature for classical objectives makespan completion Additionally, variant one metaheuristic proposed, VBIH-P. An experimental evaluation has been carried out analyse performance all methods. results show an excellent VBIH-P compared
منابع مشابه
ذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2022
ISSN: ['2405-8963', '2405-8971']
DOI: https://doi.org/10.1016/j.ifacol.2022.09.388