Permutation flow shops with exact time lags to minimise maximum lateness
نویسندگان
چکیده
منابع مشابه
Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops
This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be d...
متن کاملIterated Local Search Heuristics for Minimizing Total Completion Time in Permutation and Non-permutation Flow Shops
We study the improvement of non-permutation over permutation schedules in flow shops when minimizing the total completion time. We solve both problems by a two-phase heuristic. The first phase uses an iterated local search to find a good permutation schedule. The second phase explores non-permutation schedules using an effective insertion neighborhood, that permits to anticipate or delay a job ...
متن کاملIterative Heuristics for Permutation Flow Shops with Total Flowtime Minimization
In this paper, flow shop scheduling problems with total flowtime minimization is considered. IRZ (iterative RZ, presented by Rajendran and Ziegler, EJOR, 1997) is found to be effective to improve solutions and LR (developed by Liu & Reeves, EJOR, 2001) is suitable for initial solution developing. By integrating FPE (forward pair wise exchange) and FPE-R(forward pair wise exchangerestart) with I...
متن کاملBounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness
We consider the problem of n-jobs scheduling in an m-machine permutation flowshop with exact time lags between consecutive operations of each job. The exact time lag is defined as the time elapsed between every couple of successive operations of the same job which is equal to a prescribed value. The aim is to find a feasible schedule that minimizes the total tardiness and earliness. We propose ...
متن کاملBatch scheduling to minimize maximum lateness
We address the single-machine batch scheduling problem which arises when there are job families and setup requirements exist between these families; our objective is to minimize the maximum lateness. As our main result, we give an improved dynamic program for the solution of the problem. © 1997 Elsevier Science B.V. Kevwords: Analysis of algorithms; Dynamic programming; Production/scheduling
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 2009
ISSN: 0020-7543,1366-588X
DOI: 10.1080/00207540802320164