Permutation flow shop scheduling with earliness and tardiness penalties

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Permutation Flowshop Scheduling with Earliness and Tardiness Penalties

The main objective of the working paper series of the IIMA is to help faculty members to test out their research findings at the pre-publication stage. Abstract We address the permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries follow flowshop type of production process. There are...

متن کامل

A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling

Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objec...

متن کامل

Machine scheduling with earliness, tardiness and non-execution penalties

The study of scheduling problems with earliness–tardiness (E/T) penalties is motivated by the just-in-time (JIT) philosophy, which supports the notion that earliness, as well as tardiness, should be discouraged. In this work, we consider several scheduling problems. We begin by generalizing a known polynomial time algorithm that calculates an optimal schedule for a given sequence of tasks, on a...

متن کامل

An Enumerative Algorithm for Two-Machine Flow Shop Problems with Earliness and Tardiness Penalties

We consider a two-machine flow shop problem with a common due date where the objective is to minimize the sum of functions which penalize early as well as tardy completion of jobs. Since the problem is NP-hard in the strong sense, we investigate some general properties of optimal schedules for the problem, we develop lower and upper bounds, derive dominance criteria, and propose an enumerative ...

متن کامل

Flow Shop Scheduling with Earliness, Tardiness and Intermediate Inventory Holding Costs

We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding) and intermediate (work-in-process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig-Wolfe reformulations, we develop heur...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Production Research

سال: 2009

ISSN: 0020-7543,1366-588X

DOI: 10.1080/00207540802124301