منابع مشابه
PEP overview
Inter-hemispheric linkages in climate change: paleo-perspectives for future climate change J. Shulmeister, D. T. Rodbell, M. K. Gagan, and G. O. Seltzer Department of Geological Sciences, University of Canterbury, Private Bag 4800, Christchurch, New Zealand Department of Geology, Union College, Schenectady, NY 12308, USA Research School of Earth Sciences, The Australian National University, Can...
متن کاملSPEAR II and PEP Klystron Parameters PEP Klystron Interaction Space Parameters SPEAR II PEP
The 125 kW CW klystrons to be described in the first part of this paper were specifically designed for energy upgrading of the electron-positron storage ring, SPEAR II, at SLAC. Four tubes are required with an efficiency greater than 50 percent. The operating frequency is 358.54 MHz. The gain is approximately 50 dB, the operating voltage is 41 kV and the microperveance is 0.7. The klystron must...
متن کاملPep-ii Status*
PEP-II and BaBar have just finished run 7, the last run of the SLAC B-factory. PEP-II was one of the few highcurrent e+ecolliding accelerators and holds the present world record for stored electrons and stored positrons. It has stored 2.07 A of electrons, nearly 3 times the design current of 0.75 A and it has stored 3.21 A of positrons, 1.5 times more than the design current of 2.14 A. Highcurr...
متن کاملPEP-II Status Report
The main design features of the PEP-II asymmetric two-ring electronpositron B Factory collider, built at the Stanford Linear Accelerator Center, are described. This facility will complete construction in June 1998. The high energy ring, completed in May 1997, has had 3 months of commissioning and successfully stored 0.75 A of electrons. The success of the high energy ring testing validates not ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: PAGES news
سال: 1998
ISSN: 1563-0803,1563-0803
DOI: 10.22498/pages.6.2.9b