Penyusunan Project Planning Pembangunan Tempat Pemrosesan Akhir Kabupaten Jombang

نویسندگان

چکیده

The Jombang TPA Development Project is a project owned by the Ministry of PUPR, carried out PT. Adhi Karya (Persero), Tbk. with landfill capacity 5 hectares, not only that built supporting buildings such as leachate water installations, management and employee buildings. In 2020 there was an outbreak Covid-19 which resulted in setback implementation construction projects. planning alternative realization due to COVID-19 terms methods, quality planning, safety, health environment, costs be incurred, scheduling. Based on results this writing, site layout, traffic management, strategy using zoning system are obtained, time 446 days, plan refers occupational safety specifications controls referring OHSAS 18001: 2007, planned budget Rp. 127,446,097,744,- including 10% VAT.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

E-Monitoring Program Pembangunan Infrastruktur Perdesaan (PPIP) pada Dinas PU Cipta Karya dan Pengairan Kabupaten Muba

Information technology is widely used as a media monitor various activities. In this study, the authors will utilize IT to monitor the Rural Infrastructure Development Program (PPIP). PPIP is a program of community development at the village level in the framework of the provision of basic infrastructure in rural settlements carried out by the Directorate General of Human Settlements Ministry o...

متن کامل

Strategic Planning for E-Government Implementation of Kabupaten/Kota

The objective of e-government implementation is improving efficiency and effectiveness of public services using information and communication technology. There is much type of public services. One of the public services type is government information system. Theory of how to measure information system success implemented for e-government in this study for measuring government information system...

متن کامل

Ronneby Sweden Software Project Planning - The Relationship between Project Planning

......................................................................................................................................... 1 CONTENTS .......................................................................................................................................... 2 FIGURES ......................................................................................................

متن کامل

Supporting Agile Project Planning

In this paper, we describe a tool supporting agile iteration planning. Our tool focuses on the support of human collaboration, which in turn allows the tool to be an integral resource within the planning process. Such support is enabled by utilizing advanced technologies, and accommodating the different types of planning environments, such as horizontal and vertical surfaces. The aforementioned...

متن کامل

Optimal Construction Project Planning

The nature of the construction industry combined with the lack of appropriate techniques and technologies suitable for construction work are among the main reasons for inadequate industry performance. Researchers need to develop a better understanding of the construction industry and develop approaches and technologies that will enable construction companies to do a better job in estimating, pl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Indonesia Sosial Teknologi

سال: 2022

ISSN: ['2723-6609', '2745-5254']

DOI: https://doi.org/10.36418/jist.v3i12.551