Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung - Palembang -Betung)

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Sistem Informasi Penjualan Dan Perbaikan Komputer (Studi Kasus: CV Computer Plus Palembang)

s: The purpose of this research is to develop an Information System of Selling and Services using Microsoft Visual Basic and Microsoft Access for it database. The benefits of this research is to help CV Computer Plus in selling and services data processing everyday. To develop this IS is used 5 (five) steps: 1) Planning, 2) Analysis, 3) Design, 4) Implementation, and 5) Evaluation. The Informat...

متن کامل

The Development of Semantic Web to Search Student Final Study Collections (Work Practice and Final Project)

1. H. F. Gunawan, “Penerapan Web Semantik Untuk Aplikasi Pencarian Pada Repositori Koleksi Penelitian ,Studi Kasus : Program Studi Sistem Informasi Stmik Mikroskil Medan,” vol. 15, no. 1, pp. 51–60, 2014. 2. I. A. S. Wicaksono, N. Charibaldi, and H. Jayadianti, “Penerapan Teknologi Semantic Web untuk Menentukan Pilihan Jalur Bis Trans Jogja,” Semin. Nas. Inform. 2010 (semnasIF 2010), vol. 2010,...

متن کامل

Richard S.J. Tol

For a long time, it was politically incorrect to speak about adaptation to climate change, because it presumably implies accepting defeat in the battle against evil emissions (Burton, 1994). This has changed, perhaps because scientists repeatedly pointed out that climate change cannot be altogether avoided even if we try very hard (Parry et al., 1998; Wigley, 1997), and perhaps because George W...

متن کامل

Deep VLT spectroscopy of the blue compact dwarf galaxies Tol 1214 – 277 and Tol 65 ⋆

We present VLT spectroscopic observations with different spectral resolutions and different slit orientations of the two metal-deficient blue compact dwarf (BCD) galaxies Tol 1214–277 and Tol 65. The oxygen abundances in the brightest H ii regions of Tol 1214–277 and Tol 65 are found to be 12 + log O/H = 7.55 ± 0.01 and 7.54 ± 0.01, or Z⊙/24 . The nitrogen-to-oxygen abundance ratios in the two ...

متن کامل

Bimal Jalan: India and Globalisation (Central Bank Articles and Speeches)

I am personally grateful to the President of the Indian Statistical Institute, Prof. M.G.K.Menon and Director, Prof. K.B.Sinha, for inviting me to be a part of this occasion. A scientist, a scholar and a public figure, Prof. Menon has led this Institute with great distinction. He has been a source of inspiration for all those connected with ISI and its teachers and students. It is a particular ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Jurnal Rekayasa Sipil (JRS-Unand)

سال: 2019

ISSN: 2477-3484,1858-2133

DOI: 10.25077/jrs.15.1.12-20.2019