Pascal spreading of short-term interest rate contracts

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comprehensive analysis of the short-term interest-rate dynamics

This paper provides a comprehensive analysis of the short-term interest-rate dynamics based on three different data sets and two flexible parametric specifications. The significance of nonlinearity in the short-rate drift declines with increasing maturity for the interest-rate series used in the study. Using a flexible diffusion specification and incorporating GARCH volatility and non-normal in...

متن کامل

Nonlinear Mean Reversion in the Short-Term Interest Rate

Using a new Bayesian method for the analysis of diffusion processes, this article finds that the nonlinear drift in interest rates found in a number of previous studies can be confirmed only under prior distributions that are best described as informative. The assumption of stationarity, which is common in the literature, represents a nontrivial prior belief about the shape of the drift functio...

متن کامل

- term , real interest rate

The stock versus flow effect of the federal debt/deficit on a real interest rate is examined in a reduced-form equation. The evidence shows a positive and significant linkage between the federal debt and an ex-post, taxadjusted, short-term, real interest rate.

متن کامل

Valuing Interest Rate Swap Contracts in Uncertain Financial Market

Abstract: Swap is a financial contract between two counterparties who agree to exchange one cash flow stream for another, according to some predetermined rules. When the cash flows are fixed rate interest and floating rate interest, the swap is called an interest rate swap. This paper investigates two valuation models of the interest rate swap contracts in the uncertain financial market. The ne...

متن کامل

Coexistence of long-term and short-term contracts

We study the length of agreements in a market in which infinitely-lived firms contract with agents that live for two periods. Firms differ in the expected values of their projects, as do workers in their abilities to manage projects. Worker effort is not contractible and worker ability is revealed during the relationship. The market dictates the trade-off between sorting and incentives. Shortan...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Futures Markets

سال: 2000

ISSN: 0270-7314,1096-9934

DOI: 10.1002/1096-9934(200011)20:10<889::aid-fut2>3.0.co;2-w