Scheduling for High-rise Building Construction Using Simulation Techniques
High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...
متن کاملPrediction Model for Hoisting Time Using Luffing-type Crane for High-rise Building Construction
Hoisting planning for systematic and efficient vertical transportation is one of the key factors for successful completion in high-rise building construction. However, despite this importance, minimal research has been carried out for predicting hoist time, which is a key player in hoisting planning. Therefore, this study proposed a prediction model for vertical hoisting time using a luffing-ty...
متن کاملTuned Mass Dampers for Earthquake Vibrations of High-rise Buildings using Bee Colony Optimization Technique
This paper investigates the application of Artificial Bee Colony (ABC) method for the optimization of Tuned Mass Dampers (TMDs) employed for high-rise structures including Soil Structure Interaction (SSI). The model is a 40-story building, and Newmark method is utilized for the structure response to Bam earthquake data. The objective is to decrease both maximum displacement and accelerati...
متن کاملA Case Study of High-Rise Construction Using Wood and Steel – WCTE2000
This paper describes the design of a 12-story apartment building on a single story basement, which has wood floor diaphragms, and structural steel gravity and lateral load resisting systems. The design objective was to develop the most cost-effective structural system while meeting building functionality goals and adhering to code requirements. The main structural and non-structural design issu...
متن کاملSimulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction
a r t i c l e i n f o Temporary hoist planning is a key factor for successful project completion in a high-rise building construction. Inadequate plans for hoists in the early stages of a project can cause problems such as failing to hoist resources as required or leaving hoists idle. There are two existing approaches, simple formulas and simulation techniques, for planning temporary hoists. Ho...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: E3S Web of Conferences
سال: 2018
ISSN: 2267-1242
DOI: 10.1051/e3sconf/20183302043